Tel: -020 8839 2439 / enquiries@logic-cert.com
 

Qualification Details

Safe Isolation Procedure for Electrical Installations (CPD unit)

The following training and assessment packages are certificated by Logic Certification Ltd to industry led standards

Title Content type
Sector:
Code: LCSIPEI
Expiry: 5 years
Guided Learning Hours: 0.5 days
Background:

This course has been developed for persons working in electrical related industries. i.e. Plumbers, Heating Engineers, Kitchen fitters, Mechanical Engineers and Appliance Installers. Its aim is to ensure learners are fully aware of and able to put in to practice the industry Safe Working Procedure for the Isolation of Electrical Supplies. The course is underpinned by the requirements laid down in the Electricity at Work Regulations and BS7671.

When working on any electrical installation whatever size it is imperative that operatives apply the correct isolation procedure every time to prevent injury to themselves and other users or engineers whilst work is taking place. Apply the industry standard procedure has been shown to prevent injury and reduce incidents of installations being made live whilst work is being carried out.

This course will deliver the knowledge and skills to ensure learners understand the requirements and can apply it on site.

Learners will:
  • Understand and identify the current regulatory requirements and documents
  • Understand the need for Safe Isolation of Electrical Circuits.
  • Establish a Safe Working Procedure for the Isolation of Electrical Supplies
  • Identify and use the correct tools for isolating electrical installations
  • Apply the skills on realistic simulation
Pre-requisites:

None, but learners should be working within the wider building services industry and have a knowledge of electrical installations.

Assessment method:
Related qualifications:
Related downloads:
Related links and support material:

Candidates wishing to find a centre near to them can use the Find A Centre facility on this site.

Centres wishing to apply for approval to run the scheme should refer to the Centre Zone.

Back to top